Excavator with his wrecking ball begins to dismantle a segment of the 1995 platform portion         
New platform was constructed directly behind the station during the summer of 1995 when the tracks through the Park Avenue tunnel 500 ft to our left were lowered to accommodate double stacks.
Date: 8/6/2009 Location: Lynchburg, VA   Map Show Lynchburg on a rail map Views: 186 Collection Of:   G. R. Harper
Author:  G. R. Harper
Excavator with his wrecking ball begins to dismantle a segment of the 1995 platform portion
Picture Categories: This picture is part of album:  Lynchburg makes ready for the Lynchburg-to-Boston, NEC Regional service.
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1701511