The conductor has closed up behind them after clearing the CSX at 128.9. |
Date:
10/16/2016 |
Location:
Akron, OH Map  |
Views:
66 |
Collection Of:

Fred Stuckmann |
|
Author: Fred Stuckmann
|
 |
Picture Categories: Action |
This picture is part of album: Finishing up their day. |