ACW 200 job is seen on track 3 to the far right, with loads they will pick up in track 2 (center of frame) and seen in the distance is CSX local F742. Where thb signal is on the far left is where the second track "used" to be. It was ripped up many years ago. Addor Siding is between that signal and the CSX motor, you can barely make out a cut of cars sitting there, which is where ACW is headed after dropping off what he has behind the motor. |