Left side view in the shadow of the Frog Bridge in the New England Central Railroad yard at Willimantic, CT. Built 9/1997 by Trinity Industries Inc. 6200 cu ft cap. Length 58' 11". |
Date:
12/3/2021 |
Location:
Willimantic, CT Map  |
Views:
30 |
Collection Of:

Leighton L. Haeseler |
Rolling Stock: |
Author: Leighton L. Haeseler
|
a.jpg) |
Picture Categories: RollingStock,Yard,Track |
This picture is part of album: UCRY equipment in CT |