This thing is fast. The tongs reach down into the ballast, grab the tie and snug it up against the rail. Then a ram pushes a spike into the tie x4. It happens quickly. /DL |
Date:
5/12/2010 |
Location:
Walkersville, MD Map  |
Views:
185 |
Collection Of:

David Larrabee |
|
Author: David Larrabee
|
 |
Picture Categories: Track |
This picture is part of album: 2010 - The Walkersville Southern |